ardestan

 status:   Completed
 Registration Date:   91-89    

master

oil-pumpjack-extraction Esfahan Province Gas Co.

Social status

oil-pumpjack-extraction Esfahan

contract type

oil-pumpjack-extraction PC

main contractor

oil-pumpjack-extraction sayal gostar company

description

Operation of the transmission line about 500 meters in diameter and 6 inches, about 37 km power line steel with a diameter of 2 to 12 inches, about 150 km networking steel and polyethylene, polyethylene production and installation of 3,700 branches, installing two stations CGS, installation 4 TBS stations in various capacities and of the cathodic protection station for 29 villages (Zafar ,Qand, ... and Mehrandu) Ardestān functions.