Haji Abad - Arzuiyeh.

 Status:  runing
 Registration Date:  92-91

            

master

oil-pumpjack-extraction Kerman Province Gas Co.

Social status

oil-pumpjack-extraction Kerman

contract type

oil-pumpjack-extraction PC

main contractor

oil-pumpjack-extraction sayal gostar company

description

6 and 10-inch gas pipeline Haji Abad - Arzuiyeh of Tupac receiving station Haji Abad existing gas pipeline begins and In a way station between the milk and Vakil Abad in the km 44, 389 + 24 main line sizes 6 inch split and until the Vakil Abad valve station 06 + 949 km in length continues Finally, 10-inch gas pipeline Arzuiyeh receiving station in km 51+ 290.15 Tupac Arzuiyeh ends.